Rejection & Scrap Calculator

Enter units produced and rejected for the rejection rate. Add material in and scrap out if you also want the scrap percentage.

Optional, for scrap percentage.

Same unit as the material input.

Definitions of downtime, planned time and good output vary between plants. Use the same definitions every time so results stay comparable.

Worked example

Inputs: Total units produced = 12000 · Rejected units = 186 · Material input = 820 · Scrap quantity = 31

Accepted units
11,814
Rejection
1.55%
Acceptance
98.45%
Scrap
3.78%

Formula

  • Rejection (%) = Rejected units ÷ Total units × 100
  • Scrap (%) = Scrap quantity ÷ Material input × 100

Calculation information

Assumptions

  • Rejected units are counted out of everything produced, not just inspected units.

Rounding

Shown to 2 decimal places.

Limitations

  • Whether rework counts as rejected is your call — be consistent.

Last reviewed 2026-11-15.

Frequently asked questions

Is scrap the same as rejection?

Not quite. Rejection counts finished units that failed inspection; scrap measures material lost, which can happen before a unit is finished.

Related data tools

Free lookups from open public data that go with this kind of work.

All Manufacturing & Industry data tools →