Machine Utilization Calculator

Enter available time and actual run time to see utilization and idle time.

Definitions of downtime, planned time and good output vary between plants. Use the same definitions every time so results stay comparable.

Worked example

Inputs: Available time = 16 · Actual run time = 13.2 · Time unit = hours

Run time
13.2 hours
Idle time
2.8 hours
Utilization
82.5%

Formula

  • Utilization (%) = Actual run time ÷ Available time × 100
  • Idle time = Available time − Run time

Calculation information

Assumptions

  • Available time is the time you decide the machine could have run (for example scheduled shifts).

Rounding

Shown to 2 decimal places.

Limitations

  • Utilization ignores speed and quality losses — use the OEE calculator for those.

Last reviewed 2026-11-15.

Frequently asked questions

How is utilization different from OEE?

Utilization only measures time running. OEE also accounts for running slower than ideal and for defective output.